All HMA Paving under this contract shall be constructed using HMA Mixes No. 13A Modified, and 36A Modified as specified in these biding specifications. Recycled material will be permitted in the HMA mixes in accordance with the KCRC’s Provision for Recycled HMA Mixtures, which is included within these specifications.
26 [ 13A Alternate relief in divorce proceedings. In any proceeding under this Act, on a petition for dissolution of marriage by a decree of divorce, except in so far as the petition is founded on the grounds mentioned in clauses (ii), (vi) and (vii) of sub-section recycled, crumb rubber to hot mix asphalt (called dry process) or the asphalt binder (called wet process) to modify the final mixture • Difficult to use in dense-graded mixtures due to residual crumb rubber • Best used in gap-graded type mixtures (SMA and OGFC) BID TABULATION - WEDNESDAY, March 28, 2018, - LOCAL ROAD SURFACING PROJECT LH4916 - ALLEGAN TOWNSHIP - On 28th Street, 120th to 122nd Avenue - 0.76 mile HMA, 13A MDOT $69.00 Ton HMA, 36A MDOT $70.00 Ton Bituminous Mixture No. 1100L, 20AA MDOT $67.50 Ton Bituminous Mixture No. 1100T, 20AA MDOT $68.00 Ton Asphalt Concrete, Intermediate Course, 448, Type 2 ODOT No Bid Ton Asphalt Concrete, Surface Course, 448, Type 1 ODOT No Bid Ton Vendor Material Description Specification 11.1 Hot Mix Asphalt Plants 11.1.1 General1-3,23, 392-394 Hot mix asphalt (HMA) paving materials are a mixture of size-graded, high quality aggregate (which can include reclaimed asphalt pavement [RAP]), and liquid asphalt cement, which is heated and mixed in measured quantities to produce HMA. Aggregate and RAP (if used) constitute over 92 percent HMA Production Manual. Use a 50 blow Marshall hammer when compacting mixtures for developing Marshall mix designs. c. Recycled Mixtures. Substituting reclaimed asphalt pavement (RAP) for a portion of the new material required to produce HMA mixture is allowed provided that the mixture is designed
proposed hma section !looking upstationi section applies sta +63.00 to sta 1 +88.00 st a 7 +66.00 to st a 7 +91.00 aggregate base, 8 inch imodifiedi !dent no. hma-t hma-l grade to this line paid for as excavation, earth item hma, 13a hma, 13a * bond coat *for information only
hma application table item awi yield performance grade hma, 13a modified (top) 260 220 #/syd p.g. 64 - 28 hma, 13a modified (leveling) 220 #/syd p.g. 64 - 28 hma bond coat (not a pay item) 0.05 to 0.15 gal/syd ss - 1h typical inlet and outlet section feit drain scale 1" = 2' * note: invert elevation of box culvert governs. top of footing &
hma, 13a item hma, 13a 220 lbs/syd. hma application table. application rate 0.05 - 0.15 gal/syd ss-ih, as directed by engineer. courses of hma (payment included in hma mix). pg 58-28 grade binder type 1 leveling course 2 top note: bond coat shall be applied between successive. 8" aggregate base 2 1 12" sand subbase. pavement section typical hma
HMA, 13A 0015 3212031 185 Ton $90.00 $16,650.00 $75.37 $13,943.45 $75.37 $13,943.45 HMA, 3C Contract # 17C0247 (Gladwin, MI Arcade St) MERL: 2018.11.1 7/10/2020 10:04 For the HMA 13A and the HMA 36A mixtures, the bidder agrees to have loading facilities available at their plant to load within a reasonable time after receiving a telephone request to do so. CP-6 must be delivered to the KCRC Yard. All freight costs must be included in the bid price Re: Convert Tons to Cubic Yards The answer to all your questions is call the quary and ask for the Unit Weight of the product. Once you have the unit weight (lbs/ft3) multiply by the amount of ft^3 you need which is length x width x height and this will tell you how many pounds you need. Also focuses on HMA airfield pavement construction and applies to other types of airfield improvements where off-peak construction is identified as the preferred delivery method. AC 150/5370-13A (PDF, 630 KB) 150/5370-13A (MS Word, 4.7 MB) The hot mix asphalt (HMA) work shall be done in accordance with the requirements of Division 5 of the Standard Specifications for Construction and as herein specified. b. Materials. The materials and estimated application rates shall be as follows: The leveling course mixture for all parking lots within the project shall be HMA, 13A with an HMA for driveways, intersections, and side roads will be included in this item. JCDOT crews will mill or cut and remove driveways prior to paving operations . Driveways that are milled or cut and removed must be tacked and shall receive one or two courses of HMA depending on the treatment, paid for as HMA 13A. Asphalt HMA 13A, 58-28 PG asphalt Concrete surfaces as approved by county highway engineer. CONSTRUCTION SIGNING: All work within Houghton County Road Commission right-of-way shall be signed according to the latest edition of the Michigan Manual of Uniform Traffic Control Devices.